The past two weeks we have made great progress.
(I say, "we", but in actuality, "WE" have done nothing.)
However, I feel that I can say "we" because "we" did watch them do most of it. Either "we" were up close and personal or "we" watched from the school-room. So, I figure, I can include "we" in the progress. Anywho...
The footers were poured and the soil leveled.
Then the cement floor was poured,
Smoothed out,
(I say, "we", but in actuality, "WE" have done nothing.)
However, I feel that I can say "we" because "we" did watch them do most of it. Either "we" were up close and personal or "we" watched from the school-room. So, I figure, I can include "we" in the progress. Anywho...
The footers were poured and the soil leveled.
Then the cement floor was poured,